Engineering, Project Management, Decomissioning and Permitting of Offshore and Onshore Facilities
Ph: 281-260-7500 262 N Sam Houston Pkwy E Suite 230 Houston, TX 77060
Location: Offshore Malaysia

Location: Offshore Malaysia

Overview

Client: Malaysian Oil Company
Date: January 2012 through October 2012
Water Depth:  166’ of water

Solutions

Project Challenges:  1. Work Location Offshore Malaysia; 2. Fast Paced Schedule,10 months award to completion; 3. Logistics Coordination; 4. Contract Management; 5. “Fixed Priced” Terms; 6. 75 day Transit of Platform from Amelia to Malaysia

Execution: JAB handled the large scope of work from project initiation through execution and final document submittal.  JAB provided structural and facilities engineering, project management, fabrication, offshore installation, logistics support. Due to the schedule requirements of the operator there was no float in the schedule. To meet the demand of the schedule equipment and supplies were sourced from around the world and shipped to Malaysia where it was received and transported to the work site.  It was imperative the jacket and deck depart Amelia, La. on June 14, 2012. The transport to Malaysia required a 180 tonne bollard pull tug towing a 300’x100’ deck barge loaded with over 1500 stons of equipment. The equipment arrive Malaysia on time and only suffered minor damage during the 75 day tow.  The offshore installation spread arrived on time and began the installation campaign. The project was completed without incident. The client was please as the project was completed on time and caused no delay to the drilling schedule. First oil was achieved in record time.

Results

Results: Project was executed on time, on budget and without incident.

Location: Vermillion 242

Overview

Location: Vermillion 242
Client: Independent Operator in GoM
Date: January 2012 through October 2012
Water Depth:  246’ of water

Solutions

Project Challenges:  1. Permit Regulations; 2. Fast Paced Schedule, 7 months award to completion; 3. Logistics Coordination; 4. Contract management; 5. “Fixed Priced” Terms

Execution: JAB handled the large scope of work from project initiation through execution and final document submittal.  JAB provided structural and facilities engineering, project management, fabrication, offshore installation, logistics support and executed the project on time and on budget. The project was completed without incident. The client was delayed in permit approval, which delayed offshore mobilization, however the project was complete on time.

Results

Results: Project was executed on time, on budget and without incident.

Location: Gulf of Mexico

Overview

Client: Independent operators in GoM
Date: April 2010 through September 2010
Water Depth:  13’ of water to 586’ of water
Project Scope:  Plug 40 wells, abandon 12 flowlines, remove 20 structures


Project Challenges:
1. Water Depth
2. Permit Regulations
3. Schedule to execute post BP Macondo disaster
4. Offload and disposal
5. Logistics coordination
6. Contract management

Solutions

Execution: JAB handled the large scope of work from project initiation through execution and final document submittal.  JAB permitted, planned and executed the project on time and on budget. JAB worked with BOEMRE, Corps of Engineers, Louisiana Wildlife and Fisheries, and Texas Parks and Wildlife to permit for platform removals, conductor P&As and jacket reefs. The initial mobilization was during April 2010 with all work be completed by September 15, 2010.

Results

The project was executed without incident to personnel, the environment or equipment.

Location: Mississippi Canyon 486 Gulf of Mexico

Overview

Client: Independent operator in GoM
Date: Summer 2010
Water Depth: 586’ of water
Project Scope: Remove large 4-pile platform with 8 conductors in 586’ of water


Project Challenges:
1. Water Depth
2. Permit Regulations
3. Schedule to execute post BP Macondo disaster
4. Weight and size of structure
5. Logistics coordination

Solutions

Execution: The project was handled by JAB from project initiation through execution and final document submittal.  JAB permitted, planned and executed the project on time and on budget. JAB worked with BOEMRE, Corps of Engineers and Louisiana Wildlife and Fisheries to permit for platform removal, conductor P&A and reef. JAB removed the deck and conductors and transported to shore for disposal. The lower section of jacket was reef in place and the upper section was towed approximately 18 miles to a reef site. It was set on bottom and toppled.

Results

The project was executed without incident to personnel, the environment or equipment.

Expert Planning, Predictable Execution.